{"id":953,"date":"2025-11-26T07:04:28","date_gmt":"2025-11-26T06:04:28","guid":{"rendered":"https:\/\/powermining.fi\/?page_id=953"},"modified":"2025-11-26T07:07:57","modified_gmt":"2025-11-26T06:07:57","slug":"rusnaus-ja-lastaus","status":"publish","type":"page","link":"https:\/\/powermining.fi\/en\/palvelut\/rusnaus-ja-lastaus\/","title":{"rendered":"Mucking"},"content":{"rendered":"<p><b>Efficient and safe handling of rock material in mining and tunnel environments.<\/b><b> Power Mining delivers scaling and loading as part of our complete rock construction services.<\/b><\/p>\n<h2>Scaling: mechanical and manual<\/h2>\n<p>Scaling removes loose rocks and boulders from blasted surfaces to maintain safe working conditions. We handle this work either mechanically or manually, depending on what the plans require and what the site conditions demand. Final surfaces and areas requiring support typically need manual scaling to achieve the right finish.<\/p>\n<h2><span style=\"font-weight: 400;\">Mucking<\/span><\/h2>\n<p>In tunneling, mucking means clearing the rock material from the tunnel face after blasting using excavators or wheel loaders, then moving it out for transport. Loading and mucking are usually the longest phase of excavation, so we focus on keeping these operations running smoothly to stay on schedule.<\/p>\n<h3>Complete tunnel construction services<\/h3>\n<p>We perform scaling and loading as part of our full-service approach: Power Mining handles every phase of tunnel construction, integrating them into one continuous operation. This gives you an efficient, safe, and cost-effective solution for your project.<\/p>\n<h2><span style=\"font-weight: 400;\">Check out our reference projects<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Power Mining provides all phases of rock construction. <a href=\"https:\/\/powermining.fi\/en\/references\/\">Check out our reference projects. <\/a><\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>Mining, rock support, scaling and loading. We engage in all phases of rock construction.<\/p>","protected":false},"author":5,"featured_media":915,"parent":89,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-953","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/powermining.fi\/en\/wp-json\/wp\/v2\/pages\/953","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/powermining.fi\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/powermining.fi\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/powermining.fi\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/powermining.fi\/en\/wp-json\/wp\/v2\/comments?post=953"}],"version-history":[{"count":4,"href":"https:\/\/powermining.fi\/en\/wp-json\/wp\/v2\/pages\/953\/revisions"}],"predecessor-version":[{"id":957,"href":"https:\/\/powermining.fi\/en\/wp-json\/wp\/v2\/pages\/953\/revisions\/957"}],"up":[{"embeddable":true,"href":"https:\/\/powermining.fi\/en\/wp-json\/wp\/v2\/pages\/89"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/powermining.fi\/en\/wp-json\/wp\/v2\/media\/915"}],"wp:attachment":[{"href":"https:\/\/powermining.fi\/en\/wp-json\/wp\/v2\/media?parent=953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}